Workshop ramblings
Been rearranging the workshop today because I ended up spreading stuff about rather illogically. I also wanted to add some boards to the roof joists to stop leaves blowing in - the eaves are open and the shed is not insulated. It's surprising how difficult it is to manoeuvre and fit an 8'x4' foot plywood sheet into an 8'2" x 4'6" space on your own! Anyway, the aim of todays mudding was to prepare for getting all the components and bits and bobs over to one side and to extend the 'projects waiting to be started' shelf which was full! All the woodwork is done now and just needs some shelves and boxing to sort out.
Oh yes and there is still the matter of running some SWA Cat6 cable out from the garage which involves lifting flags, digging a trench and other adventures.
This work is partly in preparation for Project QO100 as well as the model railway which will go where the components are now. Any heavy work is now all at one end and all electronics and servicing type stuff at the other, roughly 50/50. Pics will follow once I can actually see the benches and it doesn't just look like everything has exploded.